Rapid response

Bringing Someone Home from Hospital? Make the Everyday Routes Through the House Easier First.

Simple adaptations can help prepare the bathroom, entrance and key routes through the home before discharge.

  • Vetted & DBS checked fitters
  • Fixed, transparent pricing
  • 12-month workmanship guarantee
A fitter preparing a hallway rail as an older man returns home with his daughter

Urgent readiness checklist

What needs doing before they walk back through the door

Work through this in order. Most homes need three or four of these, not a full refit.

  1. 1

    Clear the routes they will use most

    Bed to bathroom, and front door to kitchen. Lift rugs and trailing cables, and leave turning space for a frame.

  2. 2

    Fit hallway and landing rails

    A guidance rail along the route they walk every day gives something solid to hold from the first day home.

  3. 3

    Sort the front door threshold

    A modular half step or threshold ramp plus a porch rail means the doorstep is no longer the hardest part of the day.

  4. 4

    Support the bathroom

    Grab rails at the toilet, shower and bath edge, so washing does not depend on someone else being there.

  5. 5

    Set up a key safe for carers

    A police-approved, wall-anchored key safe lets district nurses and carers in without keys being left under mats.

  6. 6

    Book the fitting around the discharge date

    Give us the date on the ward letter and we work to it — usually fitted before they are home, or within 48 hours after.

Fast fitting should not mean rushed fitting

We assess the location, use an appropriate product and fixing method, and check the completed installation before we leave.

  • Discharge date recorded
  • Practical routes considered first
  • Scope and fixed price agreed before booking

Discharge-ready bundles

Packages that cover a typical discharge

Mix and match, or ask us on the phone and we will tell you honestly what the home actually needs.

Safe Access & Entry

£245

fixed, fitted, VAT included

  • 1 modular half step
  • 1 exterior porch grab rail
  • 1 secure outdoor key safe
Enquire about this package

Complete Independence

£380

fixed, fitted, VAT included

  • Up to 5 grab rails
  • 1 half step or threshold ramp
  • 1 secure outdoor key safe
  • Priority 48-hour fitting where available
Enquire about this package

Enquiry

Priority booking around your discharge date

Give us the discharge date, the postcode and the works you think are needed. We will call you back within one working hour.

Who are you enquiring for?

No payment now and no obligation. We call you back to confirm the fixed price before anything is booked.